The Behmei Clinic Project, located in Kohgiluyeh and Boyer-Ahmad Province, has been fully implemented by the technical and engineering team of Avash Sepidar Sepehr Company.
In this project, various G-Plus duct split systems with capacities of 24,000, 36,000, and 48,000 BTUs have been installed. These duct split systems are designed to provide optimal cooling and heating across the different sections of the clinic, ensuring that each space receives the best possible air conditioning based on its specific capacity.
The equipment selection was made with the goal of ensuring comfort temperature and creating an optimal environment for both staff and patients. As a result, the cooling and heating needs of the clinic have been completely met. The installed duct split systems provide reliable and efficient performance with high energy consumption and efficiency in this project.

