The club is a place where, according to existing standards, its temperature should be between 20 and 22.5 degrees Celsius and its humidity between 40 and 60 percent.
Initially, the feasibility study and project review were carried out by the technical and engineering team of Avesh Sepidar Sepehr, and in the next stage, capacity assessment was carried out taking into account the geographical location and climatic conditions of the south of the country. Finally, this project was implemented in the form of 6 30-ton rooftop package devices from the Trust brand, and air with the desired temperature and humidity is injected into the environment through pre-insulated channels. Considering the use of the complex, in addition to the rooftop package system, a system called Heat Recovery was used. Heat Recovery is a device that is used to prevent energy waste, increase air quality, and provide fresh air.