The Baghaei Hospital Project, located in Ahvaz, Khuzestan Province, has been executed by the technical and engineering team of Avash Sepidar Sepehr Company, utilizing advanced HVAC equipment. This project was specifically designed to provide cooling and fresh air (Fresh Air) to the hospital’s surgical operating rooms.
The following equipment has been installed to meet the stringent air quality and climate control requirements of the operating rooms:
2 modular chillers with a capacity of 120 kW each, from the Trust brand
2 air handling units (AHUs) with a capacity of 19,000 CFM, supplied by Tahvieh Company
4 Wilo circulation pumps
These systems were carefully selected and installed to ensure the delivery of fresh, clean air and to maintain a safe, sterile environment for surgical procedures. The high-capacity modular chillers and air handling units provide continuous fresh air supply, regulate temperature, and maintain optimal air quality in the operating rooms. Additionally, the high-efficiency circulation pumps contribute to consistent airflow and the overall efficient operation of the system.


